(+855)15 666 215 , 93 555 948

If you are planning to build a house or develop your property for warehouse, factory, office or apartment building, per-construction termite control is the first thing you should think of. This involves numerous works.

4 STAGES OF WORK:

– Conduct site inspection (using termatrac tool)

– Set anti-termite system

– Before laying the ground slap, treat the top surface of the consolidated earth with anti-termite chemical

– Spray the barriers of the building before construction